Friday, May 30, 2025

Layout Update

I don't have much to show since I started my layout last September, but scenery only began in February. There will be four "major" scenes on the layout from right to left: a lumberyard; a fuel or chemical dealer; an Agway or feed mill; and an (undecided). The lumberyard on the right is done, and I am in the mock-up stage for the fuel dealer.



The left side has a piece of flextrack dropped in place (with a pile of rusty track off to the left that I will likely never use), and a MOW boxcar temporarily scene plopped in place (but which likely will be moved). I haven't laid track here yet because I want to finish the right side first. Plus, I enjoy trackwork and want to spread it out for as long as I can.


The work continues...

No comments:

Post a Comment